DetailsThree (3) stories , 11" iforms used
Dryvit acrylic stucco exterior finish, Fiberglass shingles
Started in November 2004-finished in February 2005
Details15" iForm , Six (6) weeks total ICF installation time. 46 and 54 High Walls
Main Exhibit Hall and Two Peripheral Buildings. Approximately 29,000 Square Feet of ICF Walls Finished to match the Spanish exterior of the original hotel
Details13 Theaters – Four convert to conference rooms , Exterior made of Petrarch Panels
A part of the Downtown Ogden Redevelopment Project. 13" and 15" iForm
Details190,000 sq ft of ICF walls, 20 THX certifiable stadium seating theaters. 8 of the theaters have modifications that allow them to double as conference auditoriums, Each theater is a fully-enclosed in ICF walls, Large food court area ,meeting rooms. 13" and 15" iForm
DetailsICFs used as interior walls, LEED Gold Certification Energy performance outperforming ASHRAE standards by 40% Energy performance outperforming pre-construction energy models by 21% Structural insulated panels used for roof. Came in $200k under budget. Finished 3 weeks ahead of schedule
DetailsAbout 13,000 ICFs Used. 13? iForm, 2 Buildings .Variable refrigerant flow.
Heat recovery units . ICFs helped to meet the seismic codes- Memphis sits in a seismic zone 3
DetailsBoth schools built identically, 13" and 15" iForm, 11,000 ICFs used, LEED Gold Certified. Photovoltaic system for Hot Water. Hydronic underslab heat, Funded by Colorados BEST program, Energy modeling showed a 72% reduction in heating costs.
Details11" iForm , Five stories plus basement, Acrylic stucco exterior finish material, Composition shingles over Chem-Steel roof. 1 ½ ton to 3-ton HVAC, 5 ½ composite concrete floors spanning approximately 15
DetailsBoth schools built identically, 13" and 15" iForm, 11,000 ICFs used, LEED Gold Certified. Photovoltaic system for Hot Water. Hydronic underslab heat, Funded by Colorados BEST program, Energy modeling showed a 72% reduction in heating costs.